Zhongke Yuanben, a Qingdao startup founded at the end of 2023, said on 6 November that it had charged a large sulfide all-solid-state battery cell in 12 minutes — at 342 Wh/kg, in a 25 cm by 14 cm pouch that came off a production line rather than a glovebox, with a pack of 16 such cells already driving a small test car on real roads. It plans a 100 MWh pilot line in 2027. That last number is the one to hold onto: 100 MWh a year is roughly 1,700 cars, and in January 2025 the company’s pilot line was making ten 20 Ah cells a month.
What the Sulfide All-Solid-State Battery Actually Did
The cell is not an exotic shape. It is a large automotive-format pouch, 25 centimetres by 14, which is the format that has to work if the chemistry is ever going to sit in a car floor. Zhongke Yuanben says the cell reached 90 mAh per gram of cathode in 12 minutes of charging, and that the same chemistry held more than 300 Wh/kg under third-party testing, across capacities from 20 Ah to 60 Ah.
The headline energy figure the company publishes for its first-generation sample is 342 Wh/kg, with a maximum measured cell of 78 Ah — about 289 Wh in one cell, which is a different order of object from the 20 Ah laboratory samples the big cell makers have been showing this year. A 20 Ah cell holds roughly 74 Wh: one twenty-eighth of a 60 kWh pack.
| Zhongke Yuanben first-generation cell | Figure |
|---|---|
| Format | Pouch, 25 × 14 cm, from a production line |
| Energy density | 342 Wh/kg measured; >300 Wh/kg under third-party test |
| Capacity range | 20–60 Ah, with a 78 Ah maximum measured |
| 12-minute charge | 90 mAh/g of cathode capacity |
| Peak rate | 50C at 55 °C — 72 seconds for a full charge or discharge |
| Safety | 220 °C hot box, cell level, no fire |
| Vehicle test | Pack of 16 × 20 Ah cells, small EV, August 2026 |
| Pilot line | 100 MWh a year, planned 2027 |
The vehicle work is the part that is genuinely new, and it happened in August rather than this week: a pack built from 16 of the 20 Ah cells was matched to a small electric car’s existing control system and driven on real roads — the first publicly reported instance of a sulfide solid-state pack propelling a vehicle in China, according to the company. That is a low bar in absolute terms. It is also the bar that every other sulfide programme has so far failed to clear in public.
The Bottleneck Was the Anode, Not the Electrolyte
Sulfide electrolytes solved their conductivity problem years ago: 10-3 to 10-2 siemens per centimetre at room temperature is close enough to a liquid that ions move fine. What has not been solved is what happens at the interfaces when you push current hard — lithium plates unevenly on the anode, the sulfide decomposes where it touches bare metal, and the cell’s internal resistance climbs until the “fast charge” becomes a heating event.
Zhongke Yuanben’s answer is not a new electrolyte. It is a multi-element lithium alloy anode — the company describes it elsewhere as a lithium-aluminium-silicon-zinc quaternary — paired with a design it calls an electron-ion co-conductive network. The claim is that this lowers interfacial impedance and suppresses sulfide decomposition, so that fast charging and cycle life stop being a trade-off. At 55 °C the material completes a full charge and discharge in 72 seconds at 50C, which the company presents as a record for sulfide cells.
Read 72 seconds carefully. That is a power measurement, at an elevated temperature, on a cell that is not being asked to hold energy for a decade. It tells you the interface can survive a violent pulse. It does not tell you the cell will still have 80% of its capacity after 1,000 ordinary fast charges, and the release does not give that number.
The Manufacturing Claim That Matters More Than 12 Minutes
The detail buried under the marketing is what the company calls non-isostatic pressing. Sulfide solid-state cells normally need isostatic pressure — uniform, from every direction — to keep the electrolyte and electrode layers in intimate contact. That is a batch process: load a stack, press it, unload it. It does not run continuously, and continuous is how every battery on earth gets cheap.
Zhongke Yuanben says it has a continuous electrode-pressing route that does not need isostatic pressure, and that the anode is made by a wet process compatible with existing equipment. If either claim survives contact with a real line, it matters more than 12 minutes, because it is the difference between a chemistry that can be demonstrated and a chemistry that can be manufactured. The company has not published line speeds, yield, or the cost per kilowatt-hour.
What 12 Minutes Really Means
The company’s phrase is “refuelling experience aligned with petrol”. The measurable claim is narrower, and the two should not be conflated.
12 minutes is not a 10-to-80% time. It is the time taken to move 90 mAh per gram of cathode capacity. If that cathode holds about 190 mAh/g in total — a normal figure for a nickel-rich layered oxide — then 90 mAh/g is roughly 47% of the cell’s capacity in 12 minutes, an average current of about 450 mA/g, or 2.4C. Our arithmetic, and it rests on an assumption the company did not state.
Set that against a liquid-electrolyte benchmark that does publish its window: CATL’s third-generation Shenxing charges 10% to 80% in 3 minutes 44 seconds, which is 70 percentage points in 3.73 minutes, or about 18.8 points a minute. Zhongke Yuanben’s figure works out at about 3.9 points a minute — 4.8 times slower by that measure.
That comparison is not the humiliation it looks like. Shenxing is a lithium-iron-phosphate cell at roughly half this energy density, and high energy density is exactly what makes fast charging hard. A sulfide cell that charges half its capacity in 12 minutes at 342 Wh/kg is doing a harder job than an LFP cell that charges 70% in under four. But the honest sentence is “a solid-state cell charged at a rate that would be ordinary for liquid electrolyte, at an energy density liquid electrolyte cannot reach” — not “as fast as filling a tank”.
100 MWh a Year Is About 1,700 Cars
The pilot line is where this story will be decided, and 100 MWh is smaller than it sounds.
| What 100 MWh a year means | Figure |
|---|---|
| Cells, at 20 Ah / 74 Wh | about 1.35 million a year — 113,000 a month |
| Packs, at 60 kWh | about 1,670 a year |
| Company’s pilot line, January 2025 | 10 cells a month |
| Scale-up required | roughly 11,000 times, in four years |
The 10-cells-a-month baseline comes from the company’s own pilot line, commissioned in Laoshan in January 2025. It may well be out of date — small lines ramp — but nobody has published a current figure, and 100 MWh a year is not a small step from where this started. It is four orders of magnitude.
For scale: CATL’s all-solid-state plan is small-batch production in 2027 and volume around 2030, and its own 20 Ah samples hold about 74 Wh each. Zhongke Yuanben is claiming cells three to four times that size, in a car, on a road, before either of the two largest cell makers has put a sulfide all-solid-state battery pack into a vehicle in public. Both things can be true: the startup can be ahead on cell format and behind on everything that turns a cell into a product.
What the Announcement Does Not Say
There is no customer. The company says FAW Jiefang, BAIC Manufacturing and Chery have visited to discuss specifications and investment — “visited to discuss” is not an order, a nomination, or a joint development agreement, and no automaker has confirmed anything.
There is no price, no yield, no line speed, and no cost per kilowatt-hour. There is no cycle-life figure in the release itself; a 4,000-cycle, 80%-retention number circulates in Chinese secondary coverage but does not appear in the company’s own text, so we have not used it.
The third-party test covers energy density. It does not appear to cover the 12-minute charging claim or the 220 °C hot box, both of which are company statements. And the hot box is a cell-level result: a pack has busbars, a housing, and a control system, none of which were in that oven.
Finally, the “first in China” framing is the company’s. The August vehicle test was not independently witnessed as far as we can establish, and the 72-second, 50C result is a laboratory measurement at 55 °C, not a charging specification for a car.
Author’s Take: The number that will still matter in three years is not 12 minutes and not 342 Wh/kg. It is “non-isostatic pressing” — the unglamorous claim that this chemistry can be pressed continuously instead of in batches. Every solid-state roadmap in the world converges on sulfides and every one of them hits the same wall: isostatic pressing does not scale, and without scaling the cell is a demonstration. A 30-person Qingdao startup says it has the continuous route, and has a car to prove the cell works. What it does not have is a line that makes more than a hundred thousand cells a month by next year, and that gap — not the charging curve — is where solid-state programmes die. Watch the 2027 pilot line’s yield, not its nameplate.
The Bottom Line: Zhongke Yuanben says its sulfide all-solid-state battery reached 342 Wh/kg in a 25 × 14 cm automotive pouch, charged to 90 mAh/g in 12 minutes, and ran a small test car on a 16-cell pack in August 2026. A 100 MWh pilot line is planned for 2027 — about 1,700 cars a year, against a January 2025 baseline of ten cells a month. The chemistry claim is credible and the volume claim is not yet; both are the company’s own, and no automaker has confirmed a relationship.
Sources & Further Reading
- China Industry & Economy Information Network (中国产业经济信息网) — “中科源本率先打通大型全固态电池’高能量密度+高倍率充电’行业瓶颈” (6 November 2026) — the 12-minute charge and 90 mAh/g figure, the 25 × 14 cm production pouch, the more-than-300 Wh/kg third-party result across 20–60 Ah, the 50C/72-second result at 55 °C, the electron-ion co-conductive network and multi-element lithium alloy anode, and the 2027 100 MWh pilot line.
- The Beijing News (新京报) — “历史性突破,硫化物全固态电池国内首次实车测试告捷” — the August 2026 vehicle test, the 16 × 20 Ah pack, the 220 °C hot box, and the comment from technical lead Wang Jiutian.
- Qingdao municipal scenario-application listing for Zhongke Yuanben — the company profile: founded at the end of 2023 in Laoshan, angel round, a team working on sulfides since 2016, the 1,600 m² pilot line of December 2024, the January 2025 20 Ah line at ten cells a month, the March 2026 scientific and technological achievement evaluation, the July 2026 first-generation launch at 342 Wh/kg, and the FAW Jiefang, BAIC Manufacturing and Chery visits.
- Company statements of 6 November 2026 on the first-generation sample — 342 Wh/kg measured, 78 Ah maximum measured capacity, 600 Wh/kg lithium-sulfide cathode as reserve technology.
- CATL Shenxing third-generation charging window of 10–80% in 3 minutes 44 seconds, as published at its April 2026 launch — used only as the liquid-electrolyte benchmark.
- EVsays — CATL’s 20 Ah all-solid-state samples — what a 20 Ah cell actually holds, and why cell size is the number that separates a milestone from a product.
- EVsays — the sulfide electrolyte bottleneck — why the cost per kilogram, not the conductivity, is what limits sulfide chemistry.
- EVsays — FAW’s 25 MWh solid-state pilot line — the automaker named as a visitor here, and what its own line can actually produce.
- EVsays — the 2027 solid-state pilot-production race — how the other Chinese programmes are scheduling the same year.
- EVsays — solid-state versus liquid electrolyte — what the chemistry change buys, and what it does not.
Notes: Every performance figure here — 342 Wh/kg, 12 minutes, 90 mAh/g, 50C and 72 seconds, the 220 °C hot box, the August vehicle test — is Zhongke Yuanben’s own, published through Chinese industry media; Evsays has not seen the third-party test report, the cell datasheet or the vehicle data, and did not witness any of it. The 47%-of-capacity-in-12-minutes and 2.4C figures, and the 4.8-times comparison with Shenxing, are our arithmetic from an assumed 190 mAh/g cathode capacity that the company has not published — treat them as an order of magnitude, not a measurement. The 100 MWh-per-year cell count, the 1,700-car figure and the 11,000-times scale-up are also our arithmetic. All figures were cross-checked against the company’s Chinese-language disclosures. Follow our correction policy for amendments, and our editorial policy for sourcing standards.